Construction Work Order Template
Pick the sections for a job-site work order, then print the blank form or download it as a CSV. It has no contract wording.
Recent
Your last 10 settings, saved only in this browser. Nothing is uploaded.

How to use the Construction Work Order Template
- Start with a preset. Pick one of the chips: “Full work order”, “Scope and approval”, “Materials focus”, “Labor focus”, or “Short (scope + done)”. You can change sections afterwards in More options.
- Fill in the header. Type a name in “Company or organization (optional)”, a number in “Work order no. (optional)”, and a date in “Date (optional)”. Empty fields print as blank lines you can write on.
- Tick one box in the priority row: “☐ Low ☐ Normal ☐ High ☐ Emergency”.
- Complete the Project block. Enter the project, the site address, and the entry in “Change from contract? (describe or write none)”.
- Describe the work in “Scope of work”. The sheet has five lines.
- Set how many rows you need in “Parts rows” and “Labor rows”. The defaults are 6 and 4.
- Enter parts and quantities in the “Materials table”, and labor hours in the “Labor table”. Fill in the Total hours row yourself.
- Record the outcome in the “Completion block”.
- Add names, signatures, and dates in the “Approval signatures” table.
- Check the “Printable form” preview. The result line reads “Printable form with {n} tables, ready to print.”
- Press the Print button to print, or choose “Download as CSV (opens in Excel)”.
Options are in More options, where you can switch each section on or off. The tool does not provide a Word file, so copy the printed sheet or open the CSV if you need to edit it elsewhere.
What does a construction work order template need to record?
A construction work order template should record what was asked for, what work was planned, what was done, and who approved it. This sheet follows that order. The header holds the work order number, date opened, requester, and priority. The Project block names the project and site address. The Scope of work section sets out the job in five lines. The Materials and Labor tables list what was used and how long it took. The Completion section and the Approval table close the record. The parts and labor tables each take 1 to 30 rows. Above 30, the sheet uses 30 and shows a warning. Entering 0 or text gives an error while that table is switched on.
The tool records what you enter. It does not calculate costs or total hours, so the Total hours row is yours to complete. The “Cost” column in the materials table is also left blank for your own figures, and the “Rate” column in the labor table works the same way. Nothing on the sheet adds them up. Blank forms and checklists record what the user finds; they do not decide anything about the job.
Why does the Change from contract? entry matter?
The “Change from contract? (describe or write none)” line is a blank line for you to describe any change to the agreed work, or to write “none”. The sheet contains no contract, warranty, payment, or liability wording. It says nothing about what a contract requires. If a change affects the contract terms, check those terms with the people responsible for the contract.
What does the approval table hold?
The Approval table has two rows, Contractor and Approved by, with Name, Signature, and Date columns. Each row is a blank line for a name, a signature and a date, which you complete by hand. A signature does not make the work correct or complete, and the sheet does not say who has to sign or what a signature means in your contract. The sheet is a general-purpose template and is not legal advice. Check the requirements of whoever asks for the record. Safety steps, such as lockout, belong in your own written procedures. The construction sheet has no lockout lines, so write those steps down in whatever procedure your own site uses, and keep this sheet as the record of scope, materials, labor and sign-off.
Worked examples
| Input | Result |
|---|---|
| 6 sections switched on | 7 tables including the header |
| 6 sections switched on | 7 tables including the header |
| 3 sections switched on | 4 tables including the header |
| 3 sections switched on | 4 tables including the header |
Calculated by the tool above; open it with the same values to see each step.
Frequently asked questions
Is this construction work order template free to use?
Yes. It runs in your browser, is free, and needs no sign-up. Nothing you type is uploaded or stored.
Can I download a Word file?
No. Use the Print button to print the sheet and copy it, or choose “Download as CSV (opens in Excel)” and open the file in Excel.
What goes in the priority row?
The row has four tick boxes: “☐ Low ☐ Normal ☐ High ☐ Emergency”. Tick the one that matches the request.
How many rows can the materials and labor tables hold?
Each table takes 1 to 30 rows. Above 30, the sheet uses 30 and shows a warning. Entering 0 or text gives an error while that table is on.
Does the sheet calculate costs or hours?
No. Nothing is calculated. The “Cost” column, the “Rate” column and the “Total hours” row are left for you to complete.
Does the form replace a contract?
No. The sheet has no contract wording and says nothing about what a contract requires. It is a general-purpose record and is not legal advice. Check what the person asking for the record requires.
Do I have to fill in the “Change from contract?” line?
The line is a blank for you to describe a change or write “none”. The sheet does not say whether you must complete it. Ask whoever asked for the record.
Related tools
HVAC Work Order Template: use it when the job involves heating, ventilation, or air conditioning equipment.
Maintenance Request Form: use it when someone needs to report a problem before any work is scheduled.
Maintenance Work Order Template: use it for routine or planned maintenance jobs on equipment or buildings.
Plumbing Work Order Template: use it for jobs involving pipes, fixtures, drains, or water supply.
Preventive Maintenance Checklist: use it for routine equipment upkeep tasks.
Preventive Maintenance Schedule: use it to lay out recurring maintenance tasks.